General description of the project

The project includes the construction of a quaywall 350 mts long by 35 mts wide in reinforced concrete. The quaywall will be built as an extension of the existing quay (Muelle de Escala).

The project also includes the expansion of the terminal’s container yard, plus extensive dredging activities and the necessary ground preparation works.

The quaywall shall have the technical specs to hold the specialized equipment used in container ship operations (gantry cranes). The container yard will be used for the stacking and storage of full and empty containers and for circulation of container handling machinery.

Terminal area - development

Date Action Area
2002 Stage 1a Land claimed from the sea
Paved area increase
1,5 Hectares/ 3.7 Acres
5,0 Hectares/12.3 Acres
2003-2007 Stage 1b Land claimed from the sea
Paved area increase
2,2 Hs/5.4 Acres
1,7 Hs/4.2 Acres
2007 - Stage 2 Land claimed from the sea
Paved area increase
- December 2008
- 1st semester 2009
13,8 Hs/ 34.1 Acres

3,5 Hs/ 8.6 Acres
10,3 Hs/ 25.4 Acres
SUMMARY Area claimed from the sea as of March 2009 17,5 Hectares/ 43.2 Acres


Technical specifications of the project
  • Length of new quaywall:350 m
  • Draft along the quaywall: 14 m
  • Expansion of the container yard: 13.8 hás
  • Pavement structural load capacity: 6 Tons/m2
  • Distance between quay bollards: 30 m
  • Bollard load capacity:
       End bollards: 250 tons
       Interior bollards: 130 tons
  • Large container ships:
    Length: 320 m
    Beam or width: 42 m
    Displacement: 100.000 tons
  • Small container ships:
    Length: 180 m
    Beam or width: 27 m
    Displacement: 24.000 tons

Project figures
  • Dredging and mud disposal    1.800.000 m3
  • Extraction of sand fill          2.600.000 m3
  • Rock for embankments      250.000 m3
  • Concrete
    Prefabricated slabs2.600 m3
    Quaywall piles3.200 m3
    In-situ5.800 m3
    Total11.600 m3
  • Metallic piles
    Quantity243
    Quaywall piles3.200 m3
    Total length9.500 m
    12-meter long tubes793


2001 2002 2004 2007 2009 2009 2009